Budget Stable Diffusion 3.5 Large on CometAPI by Requests, Not Tokens

For a provisional Stable Diffusion 3.5 Large budget on CometAPI, count generation requests, not prompt tokens. The CometAPI model page, captured on September 16, 2026, lists $0.208 per request as both its unit price and starting price. That is a dated vendor-page estimate, not a newly announced price or a verified invoice rate.

There is a labeling trap: the pricing table heading says Comet Price ( USD / M Tokens ), but the cell says Per Request:$0.208. Elsewhere, the page estimates one request at $0.208, ten at $2.08, and fifteen at $3.12. Those repeated request units and matching totals support request-based budgeting for this offering. The generic token heading is not a sound basis for a prompt-token cost calculation.

Separate the initial allowance from extra attempts

The baseline arithmetic is:

Estimated usage cost = $0.208 × planned billable requests

For illustration, suppose you authorize ten initial requests and reserve up to five additional requests for variations or retries. Assuming each counted request is billable at the displayed rate:

Budget component Billable requests Estimated cost
Initial allowance 10 $2.08
Additional allowance 5 $1.04
Total if both allowances are used 15 $3.12

This is a hypothetical allocation, not a prediction that ten requests will need five retries. Keeping the allowances separate makes the decision explicit: extra generation requests consume an additional budget, even when they serve the same intended deliverable. It does not imply that CometAPI provides a built-in allowance control.

A request budget is not a usable-image budget

The captured page does not settle three details needed before turning this estimate into an automatic retry policy:

  • Which failed attempts are billable? Do not assume either that every submitted attempt is charged or that failures are free.
  • How many images does each request return? A per-request rate alone does not establish a per-image price.
  • How many returned images will be accepted? The page provides no acceptance rate, so $0.208 is not an established cost per usable image.

Confirm the current rate, billable outcomes, and output count before enabling automatic retries. For production evaluation, calculate cost per accepted image separately from observed spend and accepted output counts; do not substitute the listed request rate for that result.

There is also a scope limit for planning variations: the page discusses ControlNet in model-family and repository contexts, but that does not establish ControlNet parameter support through CometAPI. Do not budget a specific control workflow as available without checking the relay’s supported parameters.

The practical decision is how many initial and additional requests to authorize at the captured CometAPI rate. That gives a bounded provisional usage estimate while leaving failure billing, output yield, and creative acceptance as questions to resolve rather than hidden assumptions.

I’d put an acceptance gate in front of the additional-request allowance. For this Stable Diffusion 3.5 Large budget, the production question is not just how many requests remain, but what specific defect would justify spending another one.

For a hypothetical campaign visual, define the checks before generation: the subject must remain recognizable in the intended crop, required details must be visible, and the composition must leave room for the planned headline. These are proposed brief requirements, not claims about the model’s capabilities. Review returned images against that same brief, then distinguish three cases:

  • A usable image needs only cropping or layout work: route it to finishing rather than automatically generating another variation.
  • An image misses a named requirement: record the defect and the intended prompt change before authorizing another generation request.
  • The brief itself has changed: treat that as a new creative decision requiring approval, rather than quietly consuming the retry allowance.

Keep technical failures separate from those creative rejections, since the linked page does not establish how failed attempts are billed. If the same composition requirement remains unmet after the bounded allowance, stop and reassess the brief or workflow instead of extending the allowance by default. That makes the extra-request budget a deliberate revision tool, not an open-ended search for an undefined “better” image.